Eximprod Grup

Case Studies and References

SCADA Parc Regenerabil
high voltages

Case Study

The integration of renewable energy parks into SCADA systems.

Our client is a multinational company with operations in Romania that has a network of several hundred renewable energy locations: wind farms, solar parks, and cogeneration stations. These locations require communication with multiple control centers.

Case Study

SCADA Integration Project for a Distribution System Operator's Network.

The distribution system operator – the main distributor and supplier of electricity in Romania – must create and implement the backbone of modernization to become a fully digitized company: remote automation, distribution control, and IoT for security and resilience. The solution should manage both existing equipment and next-generation systems as part of the smart grid.

References - Energy Automation and Smart Grid

Project Clients

References for Renewables

complex service solutions to electricity distribution network
Type Project Name Sponsoring Company Installed capacity County Status
Eolian
Fotovoltaic
Co-generation

References for Dispatch

Type of Service Client

References for Turnkey Projects

Proiecte la cheie Eximprod
Project Name Phase Client
Modernization and Integration into SCADA of the 110/20 kV Pătârlagele Substation
Electric Power Distribution Branch FDEE Electrica Distribution Muntenia North.
Substation and Electrical Works for the Corni Wind Park, with an installed capacity of 70 MW.
Global Wind Power / Vestas CEU
Expansion of the 110/20 kV Cudalbi Substation (Galati County)
PT +DE +Execution
FDEE Electrica Distribuție Muntenia Nord – SDEE Galați
110 kV Baleni Connection Station (Galati County
PT +DE +Execution +As Built
FDEE Electrica Distribuție Muntenia Nord – SDEE Galați
Photovoltaic Power Plant SP1 2.5MW (Buzău County)
PT +DE +As Built
Solar Consult & Development Project SRL
Connection to the Grid of Photovoltaic Power Plants SC1 and SC2 (2x 2.5MW) (Buzău County)
System Studies
Solar Consult & Development SRL
Rețele electrice de distribuție internă C.E.E. 50MW Baleni (jud. Galati)
PT +DE +Execution +As Built
Viarom Construct SA
Analysis of Power Flows and Reactive Power Requirement CEF: 2.95MW SEZ Trade & Description of Measures for Protection Against Islanded Operation of SEZ Trade Photovoltaic Power Plant (Bihor County)
System Studies
SEZ TRADE
Electrical Works for the Power Evacuation of the 70MW Corni Photovoltaic Power Plant (110kV Line 7.9km, 110/30kV Substation, 30kV Internal Distribution Network of the Park) (Galati County)
PT +DE +Execution +As Built
VESTAS CEU
Design and Execution of Electrical Works 'Connection to the National Electricity Network (SEN) of CEE Baleni: Reconductoring of 110 kV Smarda-Bujoru Overhead Line using HTLS Conductor and New 110 kV Double Circuit Overhead Line
PT +DE +Execution +As Built
Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord
Connection to the Grid of 7 Photovoltaic Power Plants with a total capacity of 65 MW (5×9.9 MW + 1×9.2 MW + 1×6.3 MW) located in Ciorani, Prahova County
PT+CS
Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord
SCADA DMS System including 4 DMS centers and the modernization of 21 transformer substations: IT/MT Azuga Substation, IT/MT Vega Substation, IT/MT Comarnic Substation, IT/MT Baltesti Substation, IT/MT Tatarani Substation, IT/MT Valea Voievozilor Substation, IT/MT IUP Substation, IT/MT Butimanu Substation, IT/MT Romlux Substation, IT/MT Valea Voievozilor Substation, IT/MT Hipodrom Substation, IT/MT Zatna Substation, IT/MT Lebada Substation, IT/MT Lunca Substation, IT/MT Tecuci Substation, IT/MT Uzina de Apa Substation, IT/MT Pechea Substation, IT/MT Beresti Substation, IT/MT Teis Substation, IT/MT Aninoasa Substation."

Please note that IT/MT stands for "Intermediate Voltage/Medium Voltage," which refers to the voltage levels used in these transformer substations.
PT+CS
Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord
Design and execution of electrical works for power evacuation from the Corni Wind Park-70MW (110 kV Substation, 110/30 kV Transformation Station, 30 kV Network for the Corni Wind Park)
PT +DE +Execution +As Built
Global Wind Power / Vestas CEU
Fiber Optic Communication Network (three interconnected fiber optic rings)
E.ON Moldova Distributie SA
E.ON Moldova EMS/DMS-SCADA System – Pilot Project for the Modernization of 25 Intermediate Voltage/Medium Voltage (IT/MT) Transformer Substations: Moinești IT/MT Substation, Vatra Dornei IT/MT Substation, Targu Neamț IT/MT Substation, Regie IT/MT Substation, Săveni IT/MT Substation, Pașcani IT/MT Substation, Delea IT/MT Substation, Rădăuți IT/MT Substation, Trușești IT/MT Substation, Izvoare IT/MT Substation, Solca IT/MT Substation, Dorohoi IT/MT Substation, Targu Ocna IT/MT Substation, Șișcani IT/MT Substation, Comănești IT/MT Substation
PT+DE+Execuție
E.ON Moldova Distribuție SA
Scroll to Top